top row.

Final inspection of the placement of the reinforcement in the

steel formwork.Curved screeding guides are positioned at intervals.

middle row.

The steel reinforcement is tied off ready for the pour.(From

left) Austral Precast’s Peter Smith and Paul Peou look on during

production with Barry Baltinas.

bottom row.

While concrete pours from the kibble,an immersion vibrator

settles the mix and releases trapped air. It’s all hands on deck to screed,

spread and trowel the concrete to produce the finished surface.

facing page.

Once cured,the panels are delivered to site and installed.

|